Construction & renovation
General contractors, renovation and public works: estimates with price analyses, measurement sheets and progress billing.
The industry is preselected at signup; change it any time in Settings.
Specification
- Units
- m² · m³ · m · lm · kg · t
- Words
- Project · Chapter · Item · Client
- Documents
- 12 types
- Countries
- Albania · Italy
Modules
What is switched on for this industry.
These modules are on from the start. Switch any other module on or off in Settings › Company, without losing anything.
- 01Measurement sheetWork out quantities from dimensions (length × width × height, number of parts, formulas) and keep the workings with the estimate.
- 02Price analysesBuild unit prices from resources (materials, labour, equipment) times quantities, with overhead and profit, so you know your real cost.
- 03Progress billingInvoice the job in stages, by milestones or by the progress of each item, with retention and advance payments.
- 04VariationsRecord extra or changed work after the client has accepted, each with its own approval and amount.
- 05Safety costsA separate group of safety costs that is never discounted, as construction contracts require.
- 06Tender discountA percentage discount on the whole offer, as in public tenders. Safety costs stay out of it.
- 07Cost summary (Quadro economico)The cost summary of Italian public works: works, safety, sums at the client's disposal and VAT.
- 08Material takeoffAdds up the materials of every item into one purchase list, ready to send to suppliers.
- 09SchedulePlan the work on a timeline (Gantt) and see the planned spending curve.
- 10Budget vs actualRecord what the job really costs (invoices, receipts, hours) and compare it with the budget.
- 11Website calculatorAn estimate calculator for your website that turns visitors into requests.
Starter price list
Ready items with example prices.
Some of the items you get at signup. Prices are realistic examples for 2026, not market prices: change them to your own costs.
| Code | Description | Unit | Unit price |
|---|---|---|---|
| IT.01.001 | Rimozione di pavimento in ceramica compreso sottofondo fino a 8 cm, carico su automezzoDemolizioni | m² | €18.44 |
| IT.02.001 | Tramezzo in laterizio forato sp. 8 cm con malta cementiziaOpere murarie | m² | €46.35 |
| IT.02.006 | Pratica edilizia CILA, direzione lavori e aggiornamento catastaleSpese tecniche | lump sum | €1,800.00 |
| IT.03.001 | Punto luce a interruttore sottotraccia, cavo FG17, serie civileImpianto elettrico | pcs | €63.97 |
| IT.03.008 | Climatizzatore dual split inverter 9000 + 12000 BTU, fornito e posatoClimatizzazione | pcs | €2,350.00 |
| IT.04.001 | Punto acqua calda/fredda in multistrato dal collettoreImpianto idrico | pcs | €169.51 |
| IT.04.003 | Vaso sospeso in ceramica con cassetta da incasso e placca di comandoSanitari | pcs | €620.00 |
| IT.04.009 | Mobile bagno sospeso 80 cm con top e specchieraArredo bagno | pcs | €780.00 |
Sample estimate
A template from the pack, calculated.
Invented quantities, the pack’s prices, the country’s VAT: the totals come from the same engine as the editor, the PDF and the API.
| No. | Code | Description | Qty | Unit price | Amount |
|---|---|---|---|---|---|
1 | Demolizioni e rimozioni | €4,819.10 | |||
| 1.1 | Rimozione di pavimento in ceramica compreso sottofondo fino a 8 cm, carico su automezzo | 77.380m² | €18.44 | €1,426.89 | |
| 1.2 | Rimozione di rivestimento murale in ceramica compreso collante | 36.540m² | €14.00 | €511.56 | |
| 1.3 | Demolizione di tramezzi in laterizio forato sp. 8–12 cm, compreso intonaco | 16.950m² | €22.00 | €372.90 | |
| 1.4 | Spicconatura di intonaco ammalorato fino al vivo della muratura | 42.000m² | €12.50 | €525.00 | |
2 | Opere murarie | €7,765.13 | |||
| 2.1 | Tramezzo in laterizio forato sp. 8 cm con malta cementizia | 15.600m² | €46.35 | €723.06 | |
| 2.2 | Parete divisoria in cartongesso a doppia lastra su orditura metallica, con isolante in lana minerale | 18.900m² | €59.44 | €1,123.42 | |
| 2.3 | Controsoffitto in cartongesso su orditura metallica, rasato e pronto per la tinteggiatura | 11.940m² | €39.25 | €468.65 | |
| 2.4 | Apertura di vano porta in muratura portante con cerchiatura in acciaio, compreso calcolo strutturale | 1.000lump sum | €1,450.00 | €1,450.00 | |
3 | Impianto elettrico | €7,408.81 | |||
| 3.1 | Punto luce a interruttore sottotraccia, cavo FG17, serie civile | 15.000pcs | €63.97 | €959.55 | |
| 3.2 | Punto presa 10/16 A sottotraccia, cavo FG17, serie civile | 26.000pcs | €63.01 | €1,638.26 | |
| 3.3 | Punto presa TV/dati RJ45 cat. 6 sottotraccia | 6.000pcs | €75.00 | €450.00 | |
| 3.4 | Quadro elettrico generale con interruttori magnetotermici differenziali, 24 moduli | 1.000pcs | €920.00 | €920.00 | |
| 44 more items in 5 chapters | |||||
- Works
- €65,515.33
- Discount 3%
- -€1,965.46
- Safety costs
- €2,180.00
- Taxable
- €65,729.87
- VAT 22%
- €1,052.06
- VAT 10%
- €6,094.78
- Total
- €72,876.71
- per m²
- €809.74
Offer PDF, page 1
- Project
- Ristrutturazione appartamento 90 m², Milano
- Company
- Edilizia Brera srl
- Engine
- @preventiv/calc 1.0.0
- Scale
- 1 : 1
Website widget
Ready-made services for your website.
The visitor picks a service, enters the quantity and gets an indicative price; you get the request with a draft estimate.
Presets for this industry are being prepared: build the widget from your own templates.
| Code | Description | Unit | Unit price |
|---|---|---|---|
| AL.01.001 | Organizimi i kantierit: rrethimi, kontejner zyre, tualet kimik, lidhja me ujin dhe energjinë elektrikePunime përgatitore | lump sum | ALL 180,000 |
| AL.02.001 | Gërmim dheu kategoria II me mjete mekanike për themele, me ngarkim në mjetGërmime | m³ | ALL 320 |
| AL.03.001 | Beton i varfër C12/15 për shtresë pastërtie nën themele, t = 10 cmBetonarme | m³ | ALL 9,600 |
| AL.04.001 | Mur me tulla me vrima 25 cm me llaç bastard M5Muratura | m² | ALL 2,796 |
| AL.05.001 | Hidroizolim themelesh me membranë bitumi SBS 4 mm me primer, ngjitur me flakëHidroizolime | m² | ALL 964 |
| AL.06.001 | Suvatim i brendshëm me makineri me llaç gëlqere-çimento, t = 1,5 cmSuvatime | m² | ALL 585 |
| AL.06.004 | Lyerje me bojë hidromat akrilike, dy duar, me astarBojëra | m² | ALL 272 |
| AL.07.001 | Kapot termoizolues me polisterol EPS 100, t = 8 cm: ngjitje, kunja, rrjetë dhe suva dekorativeKapot | m² | ALL 2,390 |
Sample estimate
A template from the pack, calculated.
Invented quantities, the pack’s prices, the country’s VAT: the totals come from the same engine as the editor, the PDF and the API.
| No. | Code | Description | Qty | Unit price | Amount |
|---|---|---|---|---|---|
1 | Punime përgatitore | ALL 575,772 | |||
| 1.1 | Organizimi i kantierit: rrethimi, kontejner zyre, tualet kimik, lidhja me ujin dhe energjinë elektrike | 1.00lump sum | ALL 180,000.00 | ALL 180,000 | |
| 1.2 | Pastrimi i sheshit të ndërtimit nga bimësia, mbeturinat dhe shtresa vegjetale deri 20 cm | 396.00m² | ALL 95.00 | ALL 37,620 | |
| 1.3 | Piketimi i objektit dhe i akseve me instrument topografik | 1.00lump sum | ALL 45,000.00 | ALL 45,000 | |
| 1.4 | Rrethim provizor kantieri me panele metalike h = 2,0 m, montim dhe çmontim | 80.00lm | ALL 1,200.00 | ALL 96,000 | |
2 | Gërmime dhe mbushje | ALL 420,105 | |||
| 2.1 | Gërmim dheu kategoria II me mjete mekanike për themele, me ngarkim në mjet | 236.54m³ | ALL 320.00 | ALL 75,693 | |
| 2.2 | Gërmim dheu me dorë për kanale dhe pusetat, kategoria II | 16.32m³ | ALL 1,600.00 | ALL 26,112 | |
| 2.3 | Ngarkim dhe transport i dheut të tepërt në vend-depozitim të miratuar, deri 10 km | 252.62m³ | ALL 650.00 | ALL 164,203 | |
| 2.4 | Mbushje me dhe nga gërmimi, me ngjeshje mekanike me shtresa 20 cm | 42.34m³ | ALL 750.00 | ALL 31,755 | |
3 | Themele betonarme | ALL 2,083,296 | |||
| 3.1 | Beton i varfër C12/15 për shtresë pastërtie nën themele, t = 10 cm | 12.90m³ | ALL 9,600.00 | ALL 123,840 | |
| 3.2 | Beton C25/30 për pllakë themeli, i hedhur me pompë dhe i vibruar | 74.66m³ | ALL 12,263.50 | ALL 915,593 | |
| 3.3 | Hekur betoni B450C: prerje, përkulje dhe montim sipas projektit | 7,092.70kg | ALL 118.12 | ALL 837,790 | |
| 3.4 | Kallëpe druri për themele, montim dhe çmontim | 26.88m² | ALL 1,478.90 | ALL 39,753 | |
| 57 more items in 9 chapters | |||||
- Works
- ALL 14,758,630
- Overheads
- ALL 1,475,863
- Profit
- ALL 1,298,759
- Contingency
- ALL 876,663
- Safety costs
- ALL 221,379
- Taxable
- ALL 18,631,294
- VAT 20%
- ALL 3,726,259
- Total
- ALL 22,357,600
- per m²
- ALL 93,157
Offer PDF, page 1
- Project
- Vilë 2-katëshe, Tiranë
- Company
- Ndërtim Shqipëria shpk
- Engine
- @preventiv/calc 1.0.0
- Scale
- 1 : 1
Website widget
Ready-made services for your website.
The visitor picks a service, enters the quantity and gets an indicative price; you get the request with a draft estimate.
Presets for this industry are being prepared: build the widget from your own templates.
Price your next job with Preventiv.
The free plan includes three estimates a month with every feature of the editor.