Skip to content

Metalwork & fabrication

Steel structures, railings, metal stairs, welding and laser cutting.

The industry is preselected at signup; change it any time in Settings.

Units
kg · t · m · pcs · h · m²
Words
Job · Section · Item · Client
Documents
9 types
Countries
Albania · Italy

What is switched on for this industry.

These modules are on from the start. Switch any other module on or off in Settings › Company, without losing anything.

  • 01Cost breakdownsBuild unit prices from resources (materials, labour, equipment) times quantities, with overhead and profit, so you know your real cost.
  • 02Material listAdds up the materials of every item into one purchase list, ready to send to suppliers.
  • 03Change ordersRecord extra or changed work after the client has accepted, each with its own approval and amount.
  • 04Options & alternativesOptional items and alternatives the client can tick on the shared offer; the totals update by themselves.
  • 05Budget vs actualRecord what the job really costs (invoices, receipts, hours) and compare it with the budget.
  • 06Quantity calculatorWork out quantities from dimensions (length × width × height, number of parts, formulas) and keep the workings with the estimate.
  • 07Website calculatorAn estimate calculator for your website that turns visitors into requests.

Ready items with example prices.

Some of the items you get at signup. Prices are realistic examples for 2026, not market prices: change them to your own costs.

CodeDescriptionUnitUnit price
MT.01.001S275 steel frame (columns, beams), shop-fabricatedSteel structureskg€3.81
MT.02.001Square-tube railing, h 100 cm, primedRailings & stairsm€112.51
MT.03.001Swing gate in tubes with sheet infillGates & fencesm²€269.40
MT.04.001Laser-cut and folded sheet partsSheet metal & laser cuttingkg€3.69
MT.05.001Anti-corrosion primer + enamel, 2 coatsSurface treatmentsm²€16.77
MT.06.001On-site erection of steel structuresInstallation & transportkg€1.23
MT.07.001Site survey and shop drawingsEngineering & documentationlump sum€380.00
MT.01.002Steel mezzanine floor with galvanised gratingSteel structuresm²€168.00
“Metalwork & fabrication” starter price list (Italy · EUR): 43 items and 4 templates. Example prices excluding VAT.

A template from the pack, calculated.

Square-tube railing or glass balustrade, optional stainless handrail, coating and fitting.

AEditor grid
ExampleStaircase railing
No.DescriptionAmount
1
Survey and drawings€440.00
1.1On-site measuring visit€60.00
1.2Site survey and shop drawings€380.00
2
Fabrication€1,938.12
2.1chosen alternativeSquare-tube railing, h 100 cm, primed€1,350.12
2.2alternativeGlass balustrade with stainless posts, 10+10 laminated€3,180.00
2.3Simple stainless wall handrail with brackets€588.00
3
Finishing€185.00
3.1Powder coating in RAL colour€185.00
2 more items in 1 chapter
BTotals bar
Production
€3,109.12
Taxable
€3,109.12
VAT 22%
€684.01
Total
€3,793.13
CPrint-ready PDF

Offer PDF, page 1

Staircase railing
Metalwork & fabrication
@preventiv/calc 1.0.0
1 : 1
Example “Staircase railing” from the “Metalwork & fabrication” starter pack: 8 items with the pack’s list prices and invented quantities, calculated live by the Preventiv engine 1.0.0.

Ready-made services for your website.

The visitor picks a service, enters the quantity and gets an indicative price; you get the request with a draft estimate.

  • 1
    Square-tube railingFabricated and primed, per metre.€112.51 / m
  • 2
    Custom swing gate€269.40 / m²
  • 3
    Laser cutting and bendingS235 sheet parts, price per kg.€3.69 / kg
CodeDescriptionUnitUnit price
MT.01.001S275 steel frame (columns, beams), shop-fabricatedSteel structureskgALL 238
MT.02.001Square-tube railing, h 100 cm, primedRailings & stairsmALL 5,426
MT.03.001Swing gate in tubes with sheet infillGates & fencesm²ALL 13,501
MT.04.001Laser-cut and folded sheet partsSheet metal & laser cuttingkgALL 288
MT.05.001Anti-corrosion primer + enamel, 2 coatsSurface treatmentsm²ALL 742
MT.06.001On-site erection of steel structuresInstallation & transportkgALL 52
MT.07.001Site survey and shop drawingsEngineering & documentationlump sumALL 25,000
MT.01.002Steel mezzanine floor with galvanised gratingSteel structuresm²ALL 14,800
“Metalwork & fabrication” starter price list (Albania · ALL): 43 items and 4 templates. Example prices excluding VAT.

A template from the pack, calculated.

Square-tube railing or glass balustrade, optional stainless handrail, coating and fitting.

AEditor grid
ExampleStaircase railing
No.DescriptionAmount
1
Survey and drawingsALL 28,000
1.1On-site measuring visitALL 3,000
1.2Site survey and shop drawingsALL 25,000
2
FabricationALL 116,712
2.1chosen alternativeSquare-tube railing, h 100 cm, primedALL 65,112
2.2alternativeGlass balustrade with stainless posts, 10+10 laminatedALL 282,000
2.3Simple stainless wall handrail with bracketsALL 51,600
3
FinishingALL 14,500
3.1Powder coating in RAL colourALL 14,500
2 more items in 1 chapter
BTotals bar
Production
ALL 201,812
Taxable
ALL 201,812
VAT 20%
ALL 40,362
Total
ALL 242,174
CPrint-ready PDF

Offer PDF, page 1

Staircase railing
Metalwork & fabrication
@preventiv/calc 1.0.0
1 : 1
Example “Staircase railing” from the “Metalwork & fabrication” starter pack: 8 items with the pack’s list prices and invented quantities, calculated live by the Preventiv engine 1.0.0.

Ready-made services for your website.

The visitor picks a service, enters the quantity and gets an indicative price; you get the request with a draft estimate.

  • 1
    Square-tube railingFabricated and primed, per metre.ALL 5,426 / m
  • 2
    Custom swing gateALL 13,501 / m²
  • 3
    Laser cutting and bendingS235 sheet parts, price per kg.ALL 288 / kg

Price your next job with Preventiv.

The free plan includes three estimates a month with every feature of the editor.